PROJECTS

STEEL TRESTLES
CONSTRUCTION
2008
SCRUBBER YARD
OZ FACTORY
2011
DEAD SEA
2014
SOUTH DOCK
GREAT LINK
2017
LC2 CONVERSION
2019
RCTO SOUTH
STOCKER
2006-2007
HEDERA INDUSTRY
2010
OPC ROTEM
2013
RAMAT HANEGEV
2015
HADERA POWER PLANET(ACC)
RAMAT GAVREIEL(ACC)
2018
EXVO CHILLERS
2020

LC2
Conversion
Project

Osm
for over 80% of project

High-level Innovation

We used our expertise in 3D seismic and static planning coupled with tools installation to transform dining rooms and offices to a fully functional fabrication area. This  complete with SubFab and a clean room.

150 WORKERS 24/7
OSM
HIGH LEVEL INNOVATION
Click Here

South
Stocker Building

end-to-end

year long project

In this round the clock project, we integrated a complete structure with fire protection and process mechanical systems, at the highest level of professionalism.

80 WORKERS 24/7
CLADDING 10,000 SQM
CLEAN ROOM & WATERPROOFING

RCTO
THE One Stop Shop

bIG Steel
from the Best

FLawless

Design, fabrication and erection.

 Sami Najami seamlessly provided concrete, waterproofing, steel and process mechanical piping.

 

COMPLETE ONE STOP SHOP
1000 TONS OF STEEL
Play Video

ASU5

Reliable partners

Record-breaking efficiency

 
This project allowed us to prove to everyone and of course ourselves, how we could provide the best quality and service for both project and product.
150 Tonnes Of Equipment
Highest Cranes Worldwide
Play Video

Steel Trestle
Project 2022

HUGE
END-TO-END
STEEL

The One Stop Shop

 
This ongoing project is a gamechanger for steel fabrication in Israel. We are out to prove that we can provide our top level clients with the best solutions, from end-to-end.
20 WORKERS 24/7
95000 METERS LINEAR PIPING
50000 SQM2 WATERPROOFING
40000 METERS LINEAR CABLE TRAY
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
22 DESIGNERS
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Click Here
Play Video

PMB
Project

PIONEERS

OF THE PINE, AND OTHER WOOD

In the first of its kind in Israel, Sami Najami broke the mold and constructed a 5000 sqm2 office building in two weeks. The 30m beams were without columns and their installation and erection is unique, nationwide. 

1st IN ISRAEL
WOOD BEAM SPAN OF 30M
5000SQM
Slide Heading
Click Here

CHW
Project

3 Cooling towers
2 Chillers
3D scanning

flexing our innovation abilities.

With modernization high on the agenda, we were able to use all advancing and ongoing planning 3D tools, as the project progressed.

3 COOLING TOWERS
2 CHILLERS
3D SCANNING
CONCRETE,STEEL, EQUIPMENT, PIPING

Demolition
Project

40 WORKERS

7000SQM2

in just 1 month

At record speed and at optimal safety levels, a complete demolition of an LC5 building. 

Chiller Plant
Project

BUILDING Safer

BUILDING SMARTER.

By utilizing OSM practices, we were able to build and install a Chiller plant with cooling tower with just two weeks working at site.

ONLY 2 WEEKS AT PLANT
CRANE LOAD OF 90 TONS
Play Video